Humber River bridges: a 2D flood model in HEC-RAS

Course project for CIV550 (Water Resources Engineering) at the University of Toronto. The site survey was on 28 September 2026 and the model was run in November 2026.

Map of the Humber River at the Old Mill Road bridge, seen from above. Pale particle traces run from the top to the bottom between two grey piers, and two red ellipses mark the slower water in the bays on both sides below the bridge.
Velocity and particle traces at the Old Mill Road bridge in the 100-year flood at 06:00, with the full shallow water equations (SWE-ELM). The red ellipses mark the two bays below the bridge. This crop has no colour scale. The aerial background is Bing Satellite imagery as shown in HEC-RAS RAS Mapper.

A 2D HEC-RAS model of 2.1 km of the lower Humber River in Toronto, testing how flood size, the equation set and valley roughness change the water levels at three bridges.

With the full shallow water equations the water levels at the bridges rise by 0.04 to 0.05 m, and the velocity under the Old Mill arches falls from 2.24 m/s to 1.57 m/s. Slow wakes form behind the piers and the water recirculates in the side bays. The run takes 4.8 times longer than the run with the diffusion wave.

Plans of the model. SWE-ELM is the full shallow water equations.
PlanPeak inflow (m³/s)Manning’s nEquation set
Normal day3.150.065Diffusion wave
2-year flood122.40.065Diffusion wave
100-year flood475.70.065Diffusion wave
Future 100-year flood5900.065Diffusion wave
Regional flood (Hurricane Hazel)1702.10.065Diffusion wave
Full momentum475.70.065SWE-ELM
Rougher valley475.70.078Diffusion wave
Smoother valley475.70.052Diffusion wave

The mesh has 213,349 cells of 5 m, refined to 1 m at the banks and 2 m at the 11 piers.

The 2-year, 100-year and Regional flows are from Civica (2018), and the structure data are from the Toronto and Region Conservation Authority (TRCA, 2018). The terrain is the Ontario lidar digital terrain model (package GTA2023-DTM-05), used under Ontario’s Open Government Licence. This is a course project and not a regulatory flood study.